Faster chat, better deals — Get the App

CONSTRUCTION PLANNING ANALYST - Horto

Indeed

Company

Job typeFull-time
Workplace typeOnsite
Experience levelNo experience limit
Education levelNo degree limit

Description

Job Summary: A construction planning professional responsible for developing schedules, monitoring progress, controlling costs, and analyzing risks for the engineering team. Key Highlights: 1. Develop physical and financial construction schedules 2. Monitor progress and control construction costs 3. Analyze risks and propose adjustments to planning A construction company is seeking a Construction Planning Analyst in Teresina (Horto). **Responsibilities:** Develop physical and financial construction schedules according to projects and contracts. Monitor activity progress by comparing actual versus planned performance. Control costs, measurements, and construction performance indicators. Update management reports and present status updates to the engineering team. Analyze risks, deadlines, and propose adjustments to construction planning. Previous experience as Project Coordinator, Construction Planner, Construction Planning Specialist, or Construction Project Analyst may indicate alignment with some of the responsibilities of this position. Bachelor's degree required. Relevant experience necessary. **Compensation and Benefits:** * Salary: Salary range will be disclosed during the interview. * Meal Allowance Professional Development. **Additional Information:** * Employment Type: Permanent \- On-site. * Schedule: Full-time * Working Hours: To be determined.

Some content was automatically translated

Posted by

João Silva

Indeed · HR

Location

João Silva

Indeed · HR

Similar jobs

CONSTRUCTION PLANNING ANALYST - Horto job by Indeed in 2026 | ok.com