Description
Job Summary:
Professional responsible for developing, monitoring, and rescheduling physical-financial construction schedules, integrating departments and presenting performance reports.
Key Highlights:
1. Work in planning and control of industrial construction projects.
2. Lead the development and monitoring of schedules.
3. Integrate teams and optimize project performance.
**Contract Type:** Individual Contractor (PJ)
**Compensation:** To be negotiated
**Working Hours:**
To be defined according to project schedules (full-time, Monday to Friday, with possibility of overtime and occasional travel as required by the project).
**Main Responsibilities:**
* Develop and structure the **baseline physical-financial schedule** for the construction project, covering resources, labor, equipment, and supplies across civil, mechanical, and electrical disciplines.
* **Monitor daily physical progress** of the construction (Planned vs. Actual), measuring productivity and performance.
* **Update and reschedule the timeline** whenever necessary, analyzing deviations, bottlenecks, and the critical path.
* **Issue performance and progress reports**, presenting results to management and conducting follow-up meetings.
* **Act as an integration link** between Engineering, Procurement, and Production, ensuring alignment among departments.
**Mandatory Requirements:**
* Completed degree in Engineering (Civil, Mechanical, Electrical, Production, or related fields).
* **Minimum 2 years of experience** in planning and control of industrial construction projects.
* **Advanced proficiency in MS Project** (mandatory requirement).
* Ability to **read and interpret technical drawings and specifications**.
* Knowledge of **quantity take-offs** and **resource histograms**.
* Willingness to travel and work on-site (construction sites).
**Desirable Qualifications:**
* Prior experience in **industrial erection, infrastructure, or agribusiness projects**.
* Ability to work under pressure and manage multiple concurrent tasks.
* Analytical, organized profile with a results-oriented mindset.
**Behavioral Competencies:**
* Organization and systemic vision
* Strong communication and technical leadership
* Decision-making ability
* Attention to detail and deadlines
If you have an analytical profile, experience in planning, and wish to work on challenging projects, please submit your resume!
**RHF Talentos – Primavera do Leste**
Minimum Education Level: Bachelor's Degree
Driver's License: Class B
Willingness to Travel