





Perform marking, assembly, disassembly, and cleaning of aluminum metal forms for concrete walls. For the first assembly, follow apartment colors and numbers, separate corners, apply release agent on two panels, then install pins and wedges to prevent wall collapse; afterward, continue following numerical sequences until all walls are closed. Install EQLS (radii and pins) to begin ceiling assembly, place ceiling panels (FL) according to project layout while immediately supporting the ceiling with props, transfer clips from assembled walls to prepare for external assembly, then install sleeves and begin facade assembly. After completing the facade, install cycle panels (CPCD) and small posts to assemble the perimeter structure, and apply release agent on the slab. **Benefits:** Transportation Allowance, Food Allowance **Required Qualifications:** Proven experience **About the company:** MRV is the largest construction company in Latin America, having already built and delivered over 500,000 homes for Brazilian families, and currently has numerous job opportunities available. Check open positions and come work with us.


