




Execution of marking, assembly, disassembly, and cleaning of aluminum metal formwork for concrete walls. First assembly following the apartment's color coding and numbering; separate the corner and two panels, apply release agent, and install pins and wedges to prevent the wall from falling; then simply follow the numbering sequence until all walls are closed. Install EQLS (radii and pins) to begin ceiling assembly. Install ceiling panels (FL) according to the project’s modular layout and immediately support the ceiling with props. Pass wall-mounted battens to assemble the exterior, then install sleeves and begin facade assembly. After completing the facade assembly, install cycle panels (CPCD) and small posts to assemble the perimeter, and apply release agent to the slab. **Benefits:** Transportation Allowance, Meal Allowance **Required Qualifications:** Experience as a metal formwork assembler for concrete walls **About the company:** MRV is the largest construction company in Latin America, having already built and delivered over 500,000 homes to Brazilian families, and currently offers numerous job opportunities. Check available positions and join us.


