···
Log in / Register
Equipment Analyst
Negotiable Salary
Indeed
Full-time
Onsite
No experience limit
No degree limit
R. Padre Carlos, 315 - Centro, Joinville - SC, 89201-110, Brazil
Favourites
Share
Some content was automatically translatedView Original
Description

Description: Specific Technical Knowledge: * Techniques for assembling and disassembling aluminum formwork. * Knowledge of system components: panels, corner pieces, props, braces, clamps, pins, wedges, etc. * Understanding of concrete pouring and curing processes. * Interpretation of design drawings and assembly sketches. * Quality control and verification of plumb, leveling, and alignment. * Practices for storage and maintenance of formwork. * Occupational safety knowledge and PPE usage regulations. Differentiators: * Experience with formwork systems from manufacturers such as Forsa, SH, SF, among others. * Experience in large-scale projects or vertical constructions using cast-in-place concrete. * Technical degree in Building Construction, Civil Engineering, Metal Structures, or related fields. * Certification or specific training in industrialized formwork systems (aluminum forms, truss forms, or similar) is desirable. Roles and Responsibilities of Formwork Professionals * SITE CHECK\-IN (Receiving and Initial Inspection) Objective: Ensure that received aluminum formwork systems are complete, intact, and suitable for use according to project technical specifications. Main technical activities: * Batch technical verification; * Dimensional and visual inspection; * Inspection of connections and hardware; * Photographic and documentary records; * MONTHLY TECHNICAL CHECKLIST (Maintenance and Field Performance) Objective: Monitor the performance, wear, service life, and technical compliance of the formwork system in use. Verification items: * Panel integrity; * Wear on concrete-contact surfaces; * Alignment and deformations; * Surface roughness inspection (impact on concrete finish quality); * Accessories and hardware; * Assembly efficiency; * Concrete pouring history; * Cleaning and storage; * CHECK\-OUT (Decommissioning and End of Use) Objective: Conduct a technical assessment of the system at the end of the project to determine reuse, maintenance, or disposal. Activities: * Final system inventory; * Post\-construction technical evaluation; * Panel condition classification; * Service life report; * Post\-construction maintenance plan; 251126020240715904

Source:  indeed View original post
João Silva
Indeed · HR

Company

Indeed
Cookie
Cookie Settings
Our Apps
Download
Download on the
APP Store
Download
Get it on
Google Play
© 2025 Servanan International Pte. Ltd.