




Carrying out marking, assembly, disassembly, and cleaning of aluminum metal formwork for concrete walls. First assembly following the apartment’s color coding and numbering: separate the corner and two panels, apply release agent, then install pins and wedges to prevent wall collapse; subsequently follow the numbering sequence until all walls are closed. Install EQLS (radii and pins) to begin ceiling formwork assembly. Install ceiling panels (FL) according to project modulation, and immediately shore the ceiling with props. Run wall-mounted battens to proceed with external formwork assembly; then install sleeves and begin façade formwork assembly. After façade formwork is assembled, install cycle panels (CPCD) and small posts to assemble the peripheral system; apply release agent to the slab. **Benefits:** Transportation Allowance, Basic Food Basket, On-site Breakfast **Required Qualifications:** No literacy requirement; leadership support provided **About the Company:** MRV is the largest construction company in Latin America, having already built and delivered over 500,000 homes to Brazilian families, and currently offering numerous job opportunities. Check available positions and join us.


