





Perform marking, assembly, disassembly, and cleaning of aluminum metal formwork for concrete walls. For the initial assembly, follow the apartment color coding and numbering: separate corner components and two panels; apply mold release agent; install pins and wedges to prevent wall collapse; then proceed sequentially according to numbering until all walls are fully assembled. Install EQLS (radies and pins) to initiate ceiling formwork assembly. Install ceiling panels (FL) following the project’s modular layout, and immediately support the ceiling using props. Apply wall-mounted screeds to prepare for subsequent external wall assembly; install sleeve covers and begin facade assembly. After completing facade assembly, install cycle panels (CPCD) and small posts to assemble the peripheral structure; apply mold release agent to the slab. **Benefits:** to be determined **About the company:** MRV is the largest construction company in Latin America, having built and delivered over 500,000 homes to Brazilian families, and currently offers numerous employment opportunities. Check available positions and join us.


