Faster chat, better deals — Get the App

Hardware leftovers from construction

R$160

Basic Info

ConditionUsed

Description

1 half-bar, 5.50 meters; 2 gate track bars, 3.00 meters each; 1 water pipe, 3.24; 2 iron angle bars, one 2.10 meters and the other 1.49 meters.

Source: olx
Some content was automatically translated

olx

Location

olx

You may also like

Hardware leftovers from construction in ibia | alvenaria | ok.com