




Execution of marking, assembly, disassembly, and cleaning of aluminum metal formwork for concrete walls. For the initial assembly, follow the apartment’s color coding and numbering: separate the corner components and two panels; apply mold release agent; insert pins and wedges to prevent wall collapse; then proceed sequentially according to numbering until all walls are fully assembled. Install EQLS (radii and pins) to initiate ceiling formwork assembly. Install ceiling panels (FL) following the project’s modular layout, and immediately support the ceiling with props. Apply wall-facing strips to the already-assembled walls to subsequently assemble the exterior; install sleeve casings and commence façade assembly. Upon completing façade assembly, install cycle panels (CPCD) and small posts to assemble the perimeter structure. Apply mold release agent to the slab. **Benefits:** Transportation Allowance, Meal Allowance **Required Qualifications:** No literacy requirement; leadership support provided **About the Company:** MRV is Latin America’s largest construction company, having built and delivered over 500,000 homes to Brazilian families, and currently offers numerous employment opportunities. Check available positions and join us.


